Inspections Requirements
All construction or work for which a permit is required must be inspected by the City Building Inspector. All work should remain accessible and exposed for inspection purposes until approved.
View the Ordinance 2020-025(O) FY20/21 Master Fee Schedule for a complete list of fees
How do I request an Inspection?
- Inspections must be scheduled through the Self-Service Permitting & Inspection Center
- Learn how to request an inspection (PDF)
- Requests must be submitted 24 hours in advance (Monday-Friday)
For assistance, view the Customer Help Guide for Requesting an Inspection (PDF) or Viewing Inspection Reports (PDF) Please contact the Permit Department for additional help.
ALL PERMITS ISSUED BEFORE 8/13/2021 must contact the Permits Department. The permits issued before 8/13/2021 will have a nine (9) digit permit number. (Example: 210801059) Inspections for these permits cannot be requested online.
You may also contact the Permit Department by calling 210-655-0022 Ext. 2430 When requesting an inspection, you must provide contact information, project address, type of inspection, and permit number. Inspection results will be posted within 24 hours of the inspection under the "View All Inspections" tab on the online payment portal.
Required Inspections (Based on Type of Work)
All work that is performed needs to be inspected to ensure that it is done in accordance with the applicable codes adopted by the City of Windcrest. If you are unable to find an inspection that pertains to your type of work performed on the list below, please select "Other" and specify on the Inspection Request Form.
Type of Construction | Required Inspections |
---|---|
New construction | Building final Flatwork Frame Insulation Pre pour (foundation) Rough-in electrical Rough-in mechanical Rough-in plumbing Top out TOPS |
Mechanical | Final inspection Rough-in (if necessary) |
Plumbing | Final inspection Gas test (if necessary) Rough-in Sewer Top out Tunnel Tunnel Water heater |
Electrical | Rough-in Final |
Roof | Final |
Accessory Building | Final |
Foundation | Final Engineer’s Report |
Irrigation | Final |
Fence | Final |
Remodel | Final |