All construction or work for which a permit is required shall be inspected by the City Building Inspector. All work should remain accessible and exposed for inspection purposes until approved.
New construction
rough-in plumbing rough-in electrical rough-in mechanical pre pour (foundation) flatwork frame insulation top out TOPS building final
rough-in (if necessary) final inspection
rough-in top out final inspection tunnel water heater tunnel sewer gas test (if necessary)
rough-in final
final
final engineer's report